Construction progress | rain barrels and deep water culture trough plus media bed

Final plumbing of the first run diverters and connection to the storage barrels.
The marvels of a ping pong ball when it comes to diverting water.

IMG_6203IMG_6205

Liner in the deep water culture trough

IMG_6213

The last of the media bed framing in place. Next comes insulation and liner 🙂

IMG_3369IMG_6214

Advertisements